Time units for simulations
Instead of entering a name for the time unit of the simulation, you can now select one of twelve different time units (e.g. “Year”, “Quarter”, “Week” or “Day”).
For the simulation duration, a concrete time period can then be set instead of a simple number of rounds. (e.g. “2001 – 2010” for the unit “year”). This time frame will be used in the simulation as a basis for naming all rounds.
Existing models that have already entered a time designation (such as “Year”) as the time unit will automatically be converted to the new system. Of course, the general designation “round” can be retained as well.
Improvements
The entry of the time delay of a relation has been revised for more comprehensibility.
In the “Variables” section, the sidebar is now consistently expanded each time you click on it.
The question field is no longer displayed on the web as long as it has no content.
Invalid values in number input fields are now temporarily allowed but not saved until corrected.
A login window no longer appears when changing the language without being logged in.
In the model info overlay, the description is now only open by default if it exists. If a Central Question is specified, it is automatically open.
The info overlays (model info and associated overlays) are now all movable.
Some spacing has been improved a bit. (in error messages and in the action overlay).
Publications can now be saved with a password, which can be changed in the publication management.
English names have been revised: “Influence Matrix” is now “Cross Impact Matrix”, the “Condition” of an element is now the “Status” of an element.
Bug fixes
The maximum frequency of events can now be changed again.
Conflicts during synchronization should now occur less often: conflict detection has been improved.